The Type X Long Lead 23.5-40 Degree Ridge Tray by Cavity Trays sits over each side of the roof ridge and comes with two open ends to allow water to easily and effectively discharge to the left or right side. This product will provide you with many benefits in new-build roofing projects, offering many advantages to builders.
Made from preformed DPC with an attached ready-shaped flashing. When laid in every course of a cavity wall external skin and against which a sloping roof abuts, Type X trays provide continuous stepped DPC protection running parallel with the slope. Any water and dampness in the exposed masonry skin above this stepped arrangement is prevented from gravitating in a downwards direction below it. Therefore, the masonry skin is wet above the roofline but remains dry where it becomes an internal wall. Trays come handed and, as you view the gable, the left hand trays discharge to the left and the right-hand trays discharge to the right.
Installation: The moulded features on every tray support fast and accurate positioning. The mason is required to set up a chalk line matching the roof pitch and build one tray into every course with its corner on the line. This simplified installation procedure ensures all trays align and are correctly distanced. For further information, please see our Technical Information section.
Non-standard preformed cavity trays are available, Cavity Trays can design and manufacture bespoke requirements. Non-standard trays maybe required in areas of buildings where complicated junctions are encountered. Please contact Roof Giant with your drawings and quantity required.
What you need to know
Delivery charges
Delivery access
Date and time of delivery
Failed deliveries are chargeable
Damages & missing items
Do not install purchased items if you have a query with the product (e.g. if you need to query damage that occurred during transit).
Delivery
How much does delivery cost?
Delivery charges will vary and will depend on the manufacturer, weight, size and delivery location. The cost is automatically calculated when you add items to the shopping basket.
How long will I wait for my delivery?
The estimated delivery times are shown on each product page, we will email you each step of the way to keep you informed. The majority of products can be delivered within 3-5 working days.We will advise you if the delivery period is different from than stated on our website.
Do you offer NEXT DAY delivery?
We currently offer next day delivery on certain brands. If you have a particular item that you require quicker than the guide on our website, please contact our sales team on 01858 455055 during office hours, they will be able to confirm whether a quicker delivery is possible.
What if my delivery doesn't turn up on time?
Please contact our sales office on 01858 455055 or email sales@roofgiant.com and we will advise on the status of your order.
Do you offer FREE Delivery if I spend a substantial amount?
Not as standard, we show the delivery charges separate once you go to the checkout so it is clear what you are paying for the products and delivery costs. If you are ordering larger quantities please contact out sales team who will be able to confirm if this is possible.
Do you deliver on Weekends?
Not as standard, our deliveries are made Monday to Friday. If you do need an urgent Saturday delivery please contact out sales team on 01858 455055 during office hours who will be able to confirm. This will incur a premium charge if possible.
Do you deliver to Northern Ireland/Guernsey/The Scottish Highlands/Isle of Wight?
Yes, we do but our transport charges incorporated in the site do not cover these areas, please contact our sales team on 01858 455055 during office hours for costs; or we will contact you to make the additional payment once you have completed your online purchase.
What if my delivery doesn't turn up on time?
Please contact our sales office on 01858 455055 or email sales@roofgiant.com and we will advise on the status of your order.
REFUND POLICY
Returns
Important Note: Please do not send goods back to Roof Giant before speaking to the Roof Giant sales office.
Roof Giant strongly recommend you take photographs of goods before returning. Occasionally goods are damaged during transit, therefore you may need to confirm the packaging/goods were intact (prior to collection) to the courier as part of the refund process.
As a consumer you have the right to change your mind (Consumer Regulations 2013). This right stipulates that for most products purchased online you have a legal right to change your mind within 14 days and receive a refund under the consumer contracts regulations 2013.
This right starts from the point you or someone you nominate receives the goods. If your goods are being delivered in multiple deliveries your right starts from the point the last delivery is received.
If you wish to exercise this right you must in the first instance contact us via phone 01858 455055 or email sales@roofgiant.com advising us of your wish to change your mind, its then your responsibility to arrange for the goods to be returned to us within 14 days of ending the contract.
For more information on our full returns policy, click here.